Get Free Quote
+61 450 773 669 [email protected]
Specialist Service

Car Park Fit-outs

One contractor for the entire visible car park — survey, design, install, sign off.

AS/NZS Compliant
Fully Insured
After-hours Available
What's included

The scope, in detail.

When you’re refitting or building from scratch, juggling three or four trades costs more than the work itself. We handle the full visible car park scope under one contract: site survey, traffic-flow design, line marking, bollards, wheel stops, signage, EV bay prep, height bars — all sequenced, all signed off.

Site survey & flow design
Line marking & stencilling
Bollards & wheel stops
Signage & wayfinding
Height clearance bars
EV bay preparation
Pedestrian zones & crossings
Final compliance certification
Standards we work to

Built to Australian Standards.

Every car park fit-outs install we deliver references these standards. We hand them over in writing at sign-off.

AS/NZS 2890.1
Off-Street Parking — Cars
Master standard covering bay dimensions, aisle widths, gradients, turning circles, and clearance heights.
AS 2890.6
Accessible Parking
Accessible bay quantities, dimensions, signage and shared-zone hatching.
AS 1742.11
Pavement Markings
Line colours, widths, arrows and stencil specifications.
NCC Section D3
Access for People with Disability
Mandatory minimum requirements for accessible parking provision and accessibility paths.
NCC Section J9
EV-Ready Provisions
New-build provisions for EV charging readiness in commercial car parks (in force from 2026).

Site needs car park fit-outs?

Send the address. Quote in 48 hours.

Common questions

Car Park Fit-outs, answered.

What does a full car park fit-out actually include?

+

Site survey, layout design, traffic flow modelling, line marking, bay numbering, bollards, wheel stops, signage (regulatory + directional), height bars at entry, EV bay preparation, accessible bay marking and signage, convex mirrors, and final compliance documentation.

How long does a full fit-out take?

+

A 50-bay car park typically completes in 3–5 days. 200 bays in 1–2 weeks. Large staged projects (500+ bays for shopping centres) run across multiple weekends to avoid trade disruption.

Can you do new-build car parks?

+

Yes — we coordinate with your project builder to sequence our works after concrete cure, before handover. We provide the full DA-required compliance package as part of handover.

Do you handle the design or do I provide a layout?

+

Either. Most clients want us to design the layout — we model traffic flow, bay efficiency, and accessibility compliance. Architects supply us their layout and we deliver to spec.

How do you handle change requests mid-project?

+

Variations are quoted in writing before any work proceeds. The original quote is locked unless something physical on site changes — and any extras are documented and approved before we touch them.

Do I get one invoice or several?

+

One invoice covering the entire scope, even where the works cross multiple specialties (marking, signage, fabrication, electrical coordination). Single contract, single PM, single number.

Related services

You might also need

01

Pedestrian Safety

Separating people from vehicles — handrails, barriers, tactile indicators, anti-slip systems.

View service
02

Height Bars & Access Control

Stop tall vehicles damaging your basement, sprinklers, ramps and ceilings — once.

View service
03

Wash Bay Solutions

Compliant wash bays — drainage layout, slip-rated surfaces, bunding and safety barriers.

View service
📞 Call Now ✉ Get Quote